Works in oil & gas plants: ATEX zones, qualified personnel and subcontractor coordination

Working in an oil and gas plant is nothing like building a conventional warehouse. There are potentially explosive atmospheres, facilities that cannot be shut down at will and dozens of companies sharing the same space.

Here we review what a contractor needs in ATEX zones, what personnel must be able to demonstrate and how subcontractors and plant shutdowns are coordinated on an oil & gas project.

What makes works in an oil & gas plant different

The difference is not in the concrete or the steel, but in the risk environment. In a facility handling hydrocarbons, a spark, a hot surface or an electrostatic discharge can trigger an explosion.

In an oil & gas plant, the work is planned around the risk of explosion: every tool, every permit and every shift starts from how the zone is classified.

That is why the contractor does not simply execute: it joins the safety system of the facility owner. This affects the planning of the works, the equipment that is allowed and the way third parties are coordinated.

ATEX zones: how they shape construction works

ATEX refers to explosive atmospheres: mixtures of air with flammable gases, vapours, mists or dust that, once ignited, spread combustion. Whether or not such a mixture can exist at a given point defines how work is done there.

How ATEX zones are classified

Employers must classify into zones the areas where explosive atmospheres may form, in line with Spanish Royal Decree 681/2003. The criterion is the frequency and duration of the explosive atmosphere.

  • Zones 0 (gas) and 20 (dust): explosive atmosphere present continuously, for long periods or frequently.
  • Zones 1 and 21: occasional formation during normal operation.
  • Zones 2 and 22: formation unlikely and, if it occurs, short-lived.

The detail is available in the ATEX zone classification published by Spain’s INSST (in Spanish). For the contractor the consequence is direct: you do not work the same way in an unclassified area as next to a flange in zone 1.

Equipment and tools suitable for each zone

Equipment and protective systems used in classified zones must be suitable for each zone. Their design and marking follow Directive 2014/34/EU, applicable since 20 April 2016 and transposed in Spain by Royal Decree 144/2016.

In practice, the equipment category must match the zone: category 1 is accepted in zones 0 or 20; categories 1 or 2, in zones 1 or 21; and categories 1, 2 or 3, in zones 2 or 22.

Practical warning: before mobilising machinery or tools, check their ATEX marking and category against the work zone. Standard equipment may not be allowed in a classified zone.

assembly crew in fire resistant clothing working in a classified zone of a refinery

The explosion protection document

The employer must draw up and keep an explosion protection document. It sets out the risk assessment, the measures adopted and the zone classification, and must be ready before work begins.

When workers from several companies are present, the owner of the workplace coordinates the safety measures and details them in that document. It is the starting point for any contractor entering the plant.

Works in a refinery versus a conventional industrial warehouse

The construction technique is similar; the context is not. These are the differences that weigh most in practice:

  • Ignition risk: in a refinery it conditions tools, welding and vehicles; in a conventional warehouse it rarely limits the working method.
  • Access and control: in a plant you enter with authorisations, inductions and work permits.
  • Coexistence with operations: the facility usually stays in operation while work takes place nearby.
  • Documentation: procedures, risk analyses and personnel records are reviewed before starting.
  • Deadlines: many tasks are concentrated in shutdown windows.

The difference between a warehouse and a refinery is not the construction technique but the margin for error: in a classified zone, a procedural failure has safety consequences, not just quality ones.

If you are looking for the general picture of the sector, we review the trends in industrial construction in another article.

Qualified personnel: what is expected from specialised labour

Training and accreditations for working in a classified zone

Explosive-atmosphere regulations require workers to receive sufficient and adequate training on explosion risks and prevention measures. As this is an organisational measure, the plant owner usually details it in its own access requirements.

In practice, a contractor should be able to demonstrate:

  • Occupational risk prevention training suited to the role and the sector.
  • Specific training on explosive atmospheres and work in classified zones.
  • Valid medical fitness of the personnel.
  • Induction in the plant’s rules and its emergency plan.
  • Previous, verifiable experience in similar works.

Important: the exact requirements are set by each facility owner and each project. Ask for them in writing before mobilising the team, not on the day of access.

Profiles mobilised on this type of project

In industrial assembly and maintenance, the most in-demand profiles are welders, fitters, boilermakers and industrial painters. In industrial construction with specialised labour we cover these profiles and manage mobility and authorisations on international projects.

Subcontractors and plant shutdowns: how they are coordinated

Coordination of business activities

When several companies work at the same site, each must cooperate in applying preventive regulations. The works may or may not be construction works, but in both cases the coordination of business activities applies (INSST, in Spanish), together with Royal Decree 1627/1997 when they are construction works.

subcontractor coordination meeting before an industrial plant shutdown

Work permits and simultaneous works

In a plant, high-risk works are usually authorised through work permits: welding, hot work, confined spaces or excavations. The permit describes what is done, where, with what means and under what conditions.

When works run simultaneously, each activity is reviewed to make sure it does not interfere with another. An excavation next to a live line is not planned the same way as an isolated installation.

Plant shutdowns

Plant shutdowns concentrate into a few weeks work that would normally be spread over months. There are many companies, a lot of personnel and little room for delay.

To make them work, you usually need:

  • A shutdown plan with clear milestones and responsible people.
  • A single coordination contact per company.
  • Daily follow-up meetings during execution.
  • Stockpiles and access planned well in advance.
  • Personnel accredited before the start date.

A well-coordinated shutdown is decided weeks beforehand: with accredited personnel, approved procedures and materials on site from day one.

If you are considering outsourcing part of the recurring tasks, we explain what to demand from an industrial maintenance contractor in another article.

Safety guarantees a specialised contractor must provide

A solvent contractor is recognised by what it can demonstrate before starting: documentation, accredited personnel and verifiable procedures.

Beyond minimum compliance, a reliable contractor should be able to demonstrate the following:

  • Management system: documented procedures and quality, environmental and safety certifications (ISO 9001, 14001 and 45001).
  • Risk assessment specific to the work and coordinated with the facility owner.
  • Suitable equipment: machinery and tools fit for the zone, with up-to-date maintenance.
  • Accredited personnel with experience in similar facilities.
  • Preventive resources and an emergency plan aligned with the plant’s own.

To review the fundamentals, we have an article on occupational safety and hygiene measures in construction.

Warning sign: a contractor that does not ask about the zone classification before bidding has probably never worked in a plant.

How we approach these projects at Site & Field

At Site & Field Global Solutions we bring more than 20 years of international experience, our own machinery and local subsidiaries. Our technical team approaches every industrial project from safety and coordination.

If you are preparing a project in a plant, contact our technical department and tell us the scope. You can also write to info@siteandfield.com or call +34-856-001-611.

Frequently Asked Questions about oil & gas plant works

What is an ATEX zone and how does it affect construction works?

An ATEX zone is an area where explosive atmospheres can form from flammable gases, vapours, mists or dust. It is classified into zones 0, 1 and 2 for gas and 20, 21 and 22 for dust, and that classification determines the equipment, permits and safety measures on site.

What certifications must personnel working in an oil & gas plant have?

Regulations require sufficient and adequate training on explosion risks, in addition to the prevention training specific to the role. The exact accreditations are set by the plant owner and the project client, so it is advisable to request them in writing before mobilising the team.

How do works in a refinery differ from a conventional industrial warehouse?

The construction technique is similar, but a refinery involves explosion risk, equipment restricted by zone, work permits, controlled access and coexistence with an operating facility. This requires more documentation, more coordination and procedures reviewed before each task begins.

How are subcontractors and plant shutdowns coordinated on an oil & gas project?

Through the coordination of business activities led by the facility owner, a shutdown plan with milestones, work permits, regular follow-up meetings and personnel accredited before the start. Each subcontractor appoints a person in charge who joins that common scheme.

What safety guarantees must a specialised contractor provide?

It must provide a work-specific risk assessment, trained and accredited personnel, equipment suitable for the zone, documented procedures, preventive resources and an emergency plan coordinated with the facility owner. Certifications such as ISO 45001 strengthen those guarantees, but they do not replace compliance on site.