STEPS TO BUILD YOUR OWN HOUSE
1· Parcel Choice
We can help you in choosing the plot where you want to build your house, as this first choice is more important than it seems when building the house.
Design and Project ·2
Our specialists, according to your preferences, will carry out a Project according to an appropriate design and they will show it to you for your approval, modifying with you any aspect.
3· Procedures, Licenses and Permits
Site and Field processes all licenses and building permits with the competent authority in each case.
Execution ·4
Our deep experience in Construction Management assures us that we can shorten the deadlines to the maximum, counting on the most suitable personnel for each job, delivering your home in the shortest time possible and with excellence in execution as a rule.
5· Delivery of keys
Once the work is finished, we will give you your custom house. And now it’s your turn to do one thing: ENJOY.
DO YOU WANT TO KNOW THE PRICE OF BUILDING YOUR HOME?
Call or write us with your idea, with the data you have, and we advise you in everything, and hand in hand giving life to your dream.
AGIL CONSTRUCTION
Agile construction is the next level in construction, creating value and eliminating structured waste under seven basic principles:
Being agile represents our way of thinking. We imagine and identify with this culture as the main guide to approach construction by applying it in almost any of the processes and work procedures.
Our team members have extensive experience in all aspects of luxury residential, civil and commercial construction, and have had the honor of collaborating with the best in the industry: engineers, subcontractors, suppliers and other leaders at the local level , regional and national.
How do we really build customized houses and turnkey projects?
Our turnkey projects are different because we always offer you the best extra variety:
OUTDOOR POOLS
NATURAL POOLS
INDOOR POOLS
HOME AUTOMATION
RADIATING FLOOR
GEOTHERMICS
HOW MUCH DOES IT COST TO BUILD A HOUSE?
The cost of building your own home depends basically on the following factors:
1
TERRAIN VALUE
The first impact, and possibly the most expensive one when we want to build our own detached house is the value of the land itself, since it is not the same to build a house in Madrid capital than to do it in a land far from large cities throughout of the national territory.
The purchase of the Solar, depending on the selected location, we can be talking about between 10% and 50% of the total budget of the construction of the house.
If you already have solar or land, the expense you reduce is very important.
On the other hand, we must know that it is very convenient to make a good study of the possibilities of acquisition of land before buying, among other things, it is important to go to the corresponding Town Hall to check if in that plot you can build, and how many heights or total area can be made housing.
Finally, it is convenient to approach the Property Registry to ensure there are no debts or charges on the deeds of the land requesting a simple note. In the same way, it must be ascertained that the ownership of the land and the square meters of surface that they have indicated correspond to the Cadastre data.
As an example, you can take a plot of 200 m2 in an average location with an approximate cost of € 100,000.
2
TERRAIN COMPOSITION
We must take into account the type, composition and structure of the land on which it is intended to build, the hardness of the materials, the slope or the existence of groundwater or are not factors to be taken into account.
The difference between a simple and a very complicated land can increase the total cost up to 10%.
3
HOUSE PROJECT
Depends on the amount of requirements or extras that are requested the price of the Project may vary minimally, it is not a very important cost compared to others.
Depending on the type of contract, the Project may be included in the execution itself.
In this Project, and related to point 2, the geotechnical and topographic study must be contemplated to ensure correct execution from the foundations and pillars.
Before starting work, a Health and Safety Plan must be available and a Civil Liability Insurance must be contracted.
In short, the Technical Project is usually 5% of the Global Budget. If we talk about a Total Budget of € 300,000, this item will be approximately € 15,000, including the Visa.
4
WORK LICENSE
Prior to any start of work execution, it is imperative to ask the corresponding City Council for a work permit and to cover the expenses related to these procedures.
In the same way it is necessary to request the connections of vital supplies as they are the electrical current and the water.
It is also important the issue of Waste Management, which varies greatly depending on the location where it is processed, but usually involves a tax expense on buildings, facilities and works, which is usually deposit a bond for such management that subsequently It will be returned.
5
HOUSE CONSTRUCTION
It is, together with the purchase of land, the most important item, which can amount to 40% to 60% of the total cost.
This concept includes everything related to labor, purchase of materials, rental of machinery, and construction management.
As a reference, and always depending on many other factors such as qualities or terms of execution, this concept usually ranges from € 800 to € 1000 per square meter. In this way, if you want to know how much a 120 m2 house costs, you can multiply 120 x 900 = 108,000 €, as a reference.
If you entrust all the work to SITE and FIELD, you will be able to verify that, by taking care of everything, the reduction of general costs is important.
6
MORTGAGE SPENDING
If the total amount of money for the construction of the house is available, the most usual thing is to apply for a mortgage loan to cover these costs, so this aspect must be taken into account, since at present it is not easy to get a credit of this style, even more so when dealing with a private individual in the construction of a home.
The construction companies in this aspect usually have it easier to obtain the mortgages when performing operations of much higher amounts.
These costs also include appraisal, notary and registration costs.
7
FINAL EXPENSES
Finally, the cost of the Public Deed of New Work must be faced before a notary.
In the same way, you must register at the Property Registry.
As in the acquisition of a home built by others, the costs of discharging essential supplies such as electricity, water, telecommunications, gas, etc. must be considered.